Mining Impacts · impact

Waste rock and strip ratio

Land · During operation

Category
Land
Timescale
During operation

Mitigation

Backfilling worked-out pit sections, using waste as construction material where it is not acid-generating, and shaping and revegetating dumps as they are built rather than at the end.

Mechanism

Reaching ore in a pit means removing everything above and around it. The strip ratio — tonnes of waste per tonne of ore — is commonly several to one, so the waste dumps are the largest structures on most sites and outlast the pit itself.

Where

Open pitQuarry