Mining Impacts · impact

Smelting energy demand

Energy · During operation

Category
Energy
Timescale
During operation

Mitigation

Siting on low-carbon grids, inert anodes and process improvements, and recycling — remelting aluminium takes a small fraction of the energy of making it from ore.

Mechanism

Pulling a metal out of its compound takes at least the energy that bound it, and often much more. Aluminium is the extreme case: Hall–Héroult electrolysis uses roughly 13–15 kWh of electricity per kilogram of metal, which is why smelters are built where power is cheap rather than where the ore is.

Where

Smelter

Open on the Mining Impacts shelf — the interactive card, the filters, and everything alongside it.

From the Impacts database in Notion, last edited 2026-08-17. This page is the row, rendered by the build; nothing on it is written by hand.